Copyright © Zhengzhou Hanfa Prospecting Machinery Co., Ltd. All Rights Reserved    ICP:11001158-1

Search
点我弹出

Contact

Vincent Guo

Messages

 

Important Links

Address

Yulan Street, High-tech Zone, Zhengzhou City, Henan Province, China.

Phone

+86-371-55019599/55019184

Contact

Products

Detail

Page view

HFDD-400 Full Hydraulic Horizontal Directional Drilling Rig

没有此类产品
Get Price
Chat Online
Detail
Parameter
Construction Site
Specification

1. Adopting first-class hydraulic products in the world and the hydraulic circuit in closed for push-pull and rotation, and open for auxiliary circuit loading sensing system working together, and with electric-hydraulic praportional control in high efficiency.

2. Adopting double power system to meet different working condition, the power unit can work with two engines or one flexibly to save the energy and to reduce the consumption; if one hydraulic system or engine goes to disorder, the other one can work normally(working capacity keeping without change, but operation speed reduced).

3. Adopting electrical and manual control of operation valve group, imported from USA, the main Sauer control valve is very reliable,

4. Pointers and electronic devices are adopted together for data showing of the rig, rig pressure, torque, rotation speed and push-pull capacities are clear at a glance.

5. Adopting two-low- speed and large torque motor made by Poclain Hydraulics Industrie SAS, France for the rotation of drill head; set with 2 gear stepless speed adjustment function, floating of spindle is helpful for protection of rod thread.

6. Adopting six motors with reducer driving for drill head feeding/pull and adopting rack and pinion transmission structure, the rig is in high stability and efficiency.

7. Installed with operation cabin equipped with air conditioner, the rig is easy to operate in a comfortable working environment.

8. Shackles can be adjusted for the space of making jaws and breaking jaws; breaker can be centered automatically, breaking accurately, stably and reliably and gripper can move on the mast full stroke.

Corresponding parameter set not found, please add it in property template of background
Engine Power

Weichai Power

2x275KW(1900r/min)

Crane on Rig 3.2t
Max. Push/Pull Capacity 4000KN Traveing Speed 2-4Km/h
Max. Feeding/Pull Speed

I Gear: 7.5m/min

II Gear: 32m/min

Max. Perissible Gradient 20°
Max. Rotation Torque

98000N·m (I Gear)

49000N·m (II Gear)

Max. Pump Max. Flow Rate 2200L/min(Optional)
Spindle turning speed

0-42r/min

0-84r/min

Maximum mud pump pressure 10MPa
Mast Pentration Angle 8°-16° Rod Size 5'' 5-1/2''
Maximum top torque 110000N·m External dimensions ( length * width * height) 15*3.15*3.4m
Maximum shackle torque

220000N·m

Weight 52t

 

Max. Pushing Capacity: 4000KN
 
Max. Rotation Torque: 98000N·m (I Gear)/49000N·m (II Gear)
 
Engine Power: 2x275KW(1900r/min)
暂未实现,敬请期待
暂未实现,敬请期待
Previous article
Next article

Products

Messages